During my engineering internship at DrinkPAK, a 24/7 high-speed beverage manufacturing facility, I worked across maintenance, production, and learning and development teams to improve equipment reliability and streamline shop-floor operations. By shadowing live machine rebuilds, preventive maintenance checks, and operators across multiple production lines, I identified critical bottlenecks in equipment redundancy, spare parts organization, and technical documentation. Across three core initiatives, I delivered measurable improvements in repair speed, capital asset utilization, and plant-wide maintenance standardization.

Where
Santa Clarita, CA

When
June 2026 - August 2026

Filler Valve Rebuild Standardization and 3D Training Tool

  • The Problem: Unstandardized Krones filler valve repairs relied heavily on tribal knowledge, causing multi-hour line-down events.

  • What I Built: I authored a step-by-step Standard Operating Procedure and preventive maintenance schedule, mounted five large exploded diagrams and parts lists inside the maintenance cage, and audited spare parts inventory to set minimum and maximum stocking levels. I also pioneered the facility's first interactive 3D rebuild web tool by translating physical caliper measurements, Krones schematics, torque specs, and shop-floor photography into a self-contained browser model of roughly 60 components across 51 guided steps.

  • The Impact: Filler valve repair times dropped from over two hours down to roughly ten minutes, and the 3D training model was adopted across additional facilities.

Reverse Osmosis Loop Capital Tie-In + Return on Investment

  • The Problem: A single Reverse Osmosis loop ran continuously at full load to supply multiple production lines, creating an expensive single point of failure.

  • What I Built: I drove the engineering, financial, and outside vendor coordination needed to revitalize a stalled capital project. By evaluating equipment quotes, installation labor, and downtime risk, I built an $84,520 return-on-investment model.

  • The Impact: My analysis proved that adding Loop 4 redundancy would cut single-event failure losses in half and pay for itself in roughly 8.5 hours of avoided downtime, moving the asset into scheduled installation during a planned plant shutdown.

Plant-Wide Maintenance Standardization

  • The Problem: Across more than 50 machines and four shifts, inconsistent documentation and hard-to-find spare parts kept maintenance teams stuck in reactive troubleshooting.

  • What I Built: I overhauled preventive maintenance templates, built structured technician onboarding skills progressions, reorganized and labeled spare parts bins, and authored or edited nearly 20 percent of all new maintenance documentation published in Acadia during my internship.

  • The Impact: These updates doubled the monthly pace of maintenance documentation, raised training completion rates from 29 percent to 58 percent, and drove a sixfold increase in proactive corrective work orders generated from weekly inspections.

Click this link to take a look at my end of internship presentation!

I gave this presentation to ~20 senior leaders within the company, including Senior Vice President of Operations (Gary Corona), the California DrinkPAK General Manager (Sean Connors), our Senior Mainteance Manager (Noah Eckert), along with several reliability engineers, maintenance technicians, and operating managers. I am so grateful to DrinkPAK for the oppurtunity they gave me, and learned so much during that summer!